Second series-production MS-21 completes first flight

Yakovlev’s second series-production MS-21-310 completed its first flight on 23 November from the Irkutsk Aviation Plant airfield, advancing the aircraft’s production and test programme. The aircraft, serial number MS.0015 and test registration 73363, flew for nearly three hours over Russia’s Irkutsk region with a factory test crew led by Damir Shaikhutdinov. It is the first MS-21 to carry an Aeroflot logo on its first flight.

United Aircraft Corporation reported that the aircraft’s systems operated without failures and that the flight assignment was completed in full. The first aircraft built to series-production standards, MS.0014, made its initial flight on 3 August. The latest flight is a production and test milestone, not a delivery or certification event; MS.0015’s delivery date and operating airline have not been confirmed.

Russian certification for the MS-21-310 is now targeted for 2027, later than the original end-2025 schedule. The first 18 aircraft for Aeroflot Group are planned for delivery in 2027 and 2028, subject to the programme timetable. The group has contracted for 108 aircraft in total, including a later order for 90. The eventual allocation among its airlines has not been made public; Rossiya has been identified as a possible initial operator.