Pratt & Whitney opens $12.5 million galvanic facility in Kalisz

RTX’s Pratt & Whitney has opened a new galvanic facility at its Kalisz manufacturing site in Poland, bringing metallic plating for components used in several aircraft engine types in-house. The $12.5 million investment adds processing capacity and is intended to improve quality control and shorten production lead times for civil, commercial and military engine components. The automated facility also uses a closed-loop water system and chemical-management and safety controls.

The plating process improves component durability and corrosion resistance. The project received support from Poland’s Generator of Ecological Concepts, a joint programme of the National Centre for Research and Development and the National Fund for Environmental Protection and Water Management. No production-capacity figure, full-operation date or quantified lead-time or environmental savings were disclosed.

Operating since 1992, the Kalisz site produces components for engines ranging from turboprops to military powerplants. It is also a centre of excellence for geared components, including the fan drive gear system used in Pratt & Whitney GTF engines that power aircraft in the Airbus A220 and A320neo and Embraer E2 families. More than 1,700 people work at the site; RTX employs over 9,500 across its businesses in Poland.